![The Arrival](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/415509-delgado-1.jpg?v=1657899299)
The Arrival
Our crews set up their trucks near the area of work.
![The Patient](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/415510-delgado-2.jpg?v=1657899299)
The Patient
One of the three buildings that were in line to be worked on.
![The Equipment](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/415511-delgado-3.jpg?v=1657899299)
The Equipment
Here are some push pier brackets and tubes that were organized and waiting for their time to shine.
![Prepping For Installation](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/415512-delgado-4.jpg?v=1657899299)
Prepping For Installation
A crew member preps the foundation for the push pier to be installed beneath it.
![Push Pier Installation](https://cdn.treehouseinternetgroup.com/uploads/photo_gallery/medium/415513-delgado-5.jpg?v=1657899299)
Push Pier Installation
This push pier was driven vertically into the ground until it reached bedrock, allowing the building to stabilize and prevent further settlement.